Factory Tour
[Frey Good E-bike supplier][OEM/ODM Support]

Factory Tour ( visit factory )

You are welcome to visit FREY company online and learn the process of electric bike production.

Dear friends, this is Ivy. Let me, on behalf of FREY welcome and guide you to visit our company and have a look at the process of electric bike production. [FreyEbikes.com]

FREY office building and plants

La zone de bureau et atelier

showroom

Showroom

Quality inspector is inspecting motors and controllers.

Quality inspector is inspecting motors and controllers.

A corner of workers are assembling electric bikes on production line

A corner of workers are assembling electric bikes on production line.

How FREY electrc bikes been produced?

Below are 5 steps you can see the process of electric bike production and delivery.

Step 1. Preparation before assembly

Sufficient parts inventory can make delivery faster, usually our delivery time is: small quantity order 10-15days; bulk order 30days.

Wheel spokes assembly and adjustmentWheel spokes assembly and adjustment
Wheel spokes assembly and adjustmentWheel spokes assembly and adjustment

Wheel spokes assembly and adjustment

Frame painting prepared  handlebar prepared
 Frame painting prepared                                               Handlebar prepared
Rear rack prepared  saddle and post prepared
 Rear rack prepared                                                   Saddle and post prepared

Step 2. Production line

frey electric bike production line

Our workers are assembling electric bikes on production line. Wheels, front fork, handlebar, brakes, chains and electrical parts etc are assemblied on line.

Want to learn more production details? Click here!

Step 3. Quality checking

Generally, bike surface, spare parts, machinery and electrical parts performance will be checked one by one. FREY has corresponding inspection standards. The inspection staff check and repair every bike according to the standards, at the same time, make corresponding records on a card for every bike. Delivery will be arranged only after all items' inspection passed.Attached: FREY electric bike inspection standards.

FREY electric bike inspection standards
Inspection items Inspection requirments
Electrical parts Displayer, controller box water proof checking.
Throttle rotate flexible, responsive.
Crank rewind motor does not work, braking makes power off normally.
Motor works properly, no abnormal sound.
Charger indicator light on, charging normally.
Moving parts Turn the wheel to swing less than 2MM;
Crank rotate flexible, no swing;
Fork and handlebar rotate flexible, no catching phenomenon, no loose, shaking phenomenon, fork with damping effect.
Gears transfer to up and down freely, no jumping, no abnormal sound.
Braking parts Braking sensitively.
Brake lever braking range reasonable, note front brake pediment problem.
Braking distance, dry=4m.
Security parts motor wheel securely installed, torque>30N.m
Front wheel and frame quick release clamping no loose.
Handlebar and stem clamping, torque>20N.mz
Spoke tension is tight and uniform.
Painting item Frame surface is bright, no scratches, no Alien.
Painting surface is smooth and uniform, no scratches and other defects;
Exposed Threaded connections no slipping;
All lines are neat appearance.
Riding effect Extract 10% of electric bikes to do the actual road test. Check working effect of the various components, include: assistance, braking, damping, battery shaking, motor noise, rated speed, climbing, electrical components cooling etc. If there is some item failed the test, then the unqualified items should be redone for the whole batch of electric bikes.

Step 4. Packaging



Step 5. Delivery

Delivery

Container loading: 96pcs/20ft; 215pcs/40HQ, specific number for every model please refer to the configuration table.

  • 1
  • 2
  • 3

Our main supplier